Case Study
Spalding Abattoir
FredShaw have completed the full installation of external ductwork and internal air socks to serve the 1st floor boning area. Total air volume 48m³/s and air socks of 1000 diameter. In addition, we have installed air socks to the rapid chill and designed/installed emergency ammonia exhaust systems. All carried out in a live production facility.